September 2014

In September 2014, programmes previously operating in Mountjoy Square, Portland Row and Temple Bar transferred to 8,000m2 of newly refurbished buildings. Information relating to programmes transferring, transport to the campus and the new facilities that are available in Grangegorman can be viewed on the DIT Grangegorman 2014 website by clicking on the graphic below.

Graphic for Grangegorman 2014 site

 

Site works 

Building Names

Each of the buildings that came into use in September has been given a name as shown on the diagram below:

Names of existing buildings

Site Plans and Building Drawings

The layout of the site in general and of the facilities in the refurbished buildings are as shown on the building drawings. The following Plan Layouts are available (click on each link to download the relevant .pdf drawing):

North House Ground Floor - NH_0_A1L

North House 1st Floor - NH_1_A1L

North House 2nd Floor - NH_2_A1L

North House Annex Ground and 1st Floors - NA 0 and NA 1

Bradogue Ground and 1st Floors - BR_0&1_A1L

Glassmanogue Ground and 1st Floors - GL_0&1_A1 L

Rathdown House Ground  - RD_0_A1L

Rathdown House 1st Floor - RD_1_A1L

Orchard House - OH_0_A1 L

Building Works on-Campus

The pink, blue and green areas on the diagram below are those that are accessible to staff and students from September 2014. As the new campus is a huge development, building works to the Greenway Hub, the Central and East Quads, the primary care centre and the primary school will proceed on the parts of the campus shown in white on the diagram. It must be noted, however, that any construction work will be carried out on specific pre-defined building plots, will be confined to areas behind hoardings and will be subject to current safety and welfare regulations that include stringent criteria relating to reduction of noise and elimination of dust.

 Areas accessible to students and staff in September 2014